A FSS combines knowledge of integrated design management, simulation technology, computer science and nuclear power engineering. With simulation integration as a platform, it can support model online revising and commissioning, sound database management, simulation operation management and I/O&network control functions. The system is mainly used to train NPP operators and improve their skill and competence, which is considered a key to ensure the safe and reliable operation of a nuclear power plant. FSS is also an important verification means of updated designs and revised operation regulations in the plant.
System Application (Full-Scope Simulator for Nuclear Power Plants)
- Operator training
- Operator license examination
- Support periodical emergency drills in nuclear power plants according to the requirements of the Sate Nuclear Safety Bureau
- Learning, verifying and confirming the design and modifications of the I&C system (V&V platform), including the human-machine interface part based on computer in the control room, process control, plant operation/emergency instruction, plant control and operation optimization, plant instantaneous state analysis and etc.
System Features (Non-Safety DCS Simulator)
- Stimulation and emulation design for an identical human-machine interface and real DCS functions, easy to maintain
- High IC storing and IC loading speed, less than 1 minute
- IC management tool, former IC compatible when upgrading DCS application software
- Support full playback function including the operation playback on the human-machine interface
- Be able to simulate all faults supported by real DCS
Application Experiences
- Full-Scope Simulator (FSS) for 4×1000MW Units 1-4 of Hong Yanhe Nuclear Power Plant
- Full-Scope Simulator (FSS) for 2×1000MW Units 3&4 of Ningde Nuclear Power Plant